The Need
The complex answers the need of the commissioning organization for an integrated development and production complex, which includes the construction of a hangar, office building, as well as a shed for equipment and a laboratory. In addition, the complex includes all of the necessary infrastructure, supporting systems and land development measures, needed to fulfil its operational requirements.
The Vision
The architectural vision emphasizes the need for a functional working area, fitted to the exact needs of the operation, alongside a modular plan which enables maximal flexibility and adaptability to any future changes and projects.
The Design
The complex’s design encompasses several principles such as creating physical proximity between the administrative and production areas, putting the rigid components of the structure (staircases/toilets/shelter etc.) in one place, designing the laboratories based on best practices for their operation and maintenance, and maximising the contact between the different structures and the complex’s envelope.
The design had to facilitate early construction efforts necessitated by the short construction schedule.